Skip to content
Talvix
Land Lease Proposal for charging station/ battery swapping — photo 1 of 21 / 2
Sites for Rent / Lease

Land Lease Proposal for charging station/ battery swapping

Location Partnership / Land Lease Proposal for charging station/ battery swapping – Kelambakkam, Chennai

  • Site: Land parcel
  • Plot area: 1500 sq ft
  • Model: Monthly rent, Long-term lease, Revenue share, Hybrid (rent + share), Build-to-suit, Open to proposals

Expected rent per month

₹40,000 /mo

Ask a question

Specifications

Site type
Land parcel
Commercial model
Monthly rent, Long-term lease, Revenue share, Hybrid (rent + share), Build-to-suit, Open to proposals
Suitable for
AC charging, DC fast charging, Battery swapping, Fleet / depot charging, Charging hub
Plot / site area
1500 sq ft
Plot dimensions
50 X30
Road frontage
40 ft
Land use / zoning
Commercial
24×7 public access
Yes
Distance to highway / main road
0 km
Nearby landmark
Opp to Chettinad 3rd gate and near DMART
Map location
Open map
Your authority to offer the site
Owner
Traffic / footfall notes
Kelambakkam to Vandalur is a heavy traffic zone

Specifications are provided by the seller. Confirm critical details before you buy.

Site assessment

Grid not verified

Conditional potential

Conditional potential as a site (52/100), but not investment-ready until ~65 kVA of grid capacity is confirmed. Suggested start: 1 × 60 kW DC.

Data confidence: low · assessed 2026-11-17

Suggested setup

60 kW

1 × 60 kW DC

Grid capacity needed

~65 kVA

not yet confirmed

Energy / month

6,159 kWh

range 2,640–9,000 · 8.2 sessions/day

Chargers nearby

0 within 5 km

0 ≤1 km · 3 ≤20 km (open map data)

  • Traffic and accessibility (20)20 / 20

    Vandalur - Mambakkam - Kelambakkam Road (primary) 30 m away; 6 major road segment(s) within 1 km

  • EV demand and local catchment (15)5.6 / 15

    5 shops, restaurants, offices, hotels and services mapped within 1 km, 54 within 3 km, 8 malls/supermarkets/hotels within 5 km (open map data under-counts places here); EV adoption factor 0.8 · low confidence

  • Charging competition (15)12 / 15

    0 known charging location(s) within 1 km, 0 within 3 km, 0 within 5 km, 0 within 10 km, 3 within 20 km (open map data is incomplete here — check on the ground) · low confidence

  • Electricity availability (20)3 / 20

    electricity connection not stated; spare capacity unknown; no utility approval yet · low confidence

  • Land suitability and expansion (10)7 / 10

    4 charging bay(s) estimated from 1500 sq ft; land use Commercial · low confidence

  • Financial viability (15)1.5 / 15

    expected case does not pay back within 10 years · low confidence

  • Landowner commitment (5)3 / 5

    offered by: Owner; financing of electrical works not stated; models: Monthly rent, Long-term lease, Revenue share, Hybrid (rent + share), Build-to-suit, Open to proposals

Strengths

  • Strong road access — Vandalur - Mambakkam - Kelambakkam Road (primary) 30 m away.
  • No charging location on open maps within 3 km (verify — map data is incomplete here).

To validate

  • Thin local catchment — few destinations nearby.
  • Grid capacity not confirmed: ~65 kVA needed for the recommended setup.
  • Financials are thin in the expected case — needs a cheaper setup or a better tariff.
  • Location is approximate (taken from the landmark in the owner's message) — an exact GPS pin will sharpen the score.
How this is calculated

Grid readiness: ~65 kVA needed; electricity availability, spare capacity and utility approval not yet provided. Setup: best risk-weighted return for this location; electrical capacity still to be confirmed.

  • Country assumptions: India; prices in INR.
  • Selling price ₹20/kWh DC and ₹14/kWh AC; electricity bought at ₹9/kWh.
  • DC demand at maturity for an average site: 3 / 7 / 12 sessions/day (conservative / expected / optimistic) × location factor 1.25 × competition factor 0.94 × 1 for 60 kW, capped at 12 sessions per DC point per day.
  • 25 kWh per DC session, 12 kWh per AC session. Daily kWh = sessions/day × kWh/session; month = 30 days.
  • Year 1 at 50 % and year 2 at 80 % of mature demand; 10-year horizon; NPV at 12 %.
  • Site owner share: declared rent ₹40,000/month. Fees 5 % of revenue + ₹1,500/charger/month software; O&M 2.5 % of charger cost per year.
  • Required kVA = charger kW × simultaneity (0.85 for 3+ points) ÷ power factor 0.95. Loads up to 100 kVA are assumed to fit a low-voltage connection; above that a dedicated transformer (min ₹6.0 L, ₹4,000/kVA). Grid works/deposit ₹1,500/kVA when spare capacity does not cover the load.
  • Location data: OpenStreetMap contributors (roads, places, charging stations). Satellite and street-level imagery are not used yet; a site visit is still needed.

Automatic screening estimate by Talvix from the site owner's details and open map data. It is not an inspection, engineering design, valuation or investment advice, and it promises no income. Grid capacity, demand and costs must be confirmed on site and with the electricity utility.

Description

I am prasad kovi and I am landowner with 1500 sqft (50X30) measurements with 50 being frontage On vandalur - Kelambakkam road, Chennai. opp to Chettinad 3rd gate and near DMART. I am looking for long term lease arrangement where sun mobility invests in and operates an EV battery swapping facility. 1,500 sq ft | 50 ft frontage | 40-ft road Vandalur–Kelambakkam State Highway, Chennai Shop/Plot No. 1, Suitable for 2W / 3W / 4W fleet / Battery swapping charging Long-term lease available Landowner-only arrangement – operator to invest, install & maintain infrastructure. Cheers Prasad kovi- 8074051504

Public questions & comments (0)

Comments are public. Don't share phone numbers, emails or site details. A price in a comment isn't an offer — use “Make offer”.

Sign in to ask a question.

    Land Lease Proposal for charging station/ battery swapping

    ₹40,000 /mo

    Ask a question