Land Lease Proposal for charging station/ battery swapping
Location Partnership / Land Lease Proposal for charging station/ battery swapping – Kelambakkam, Chennai
- Site: Land parcel
- Plot area: 1500 sq ft
- Model: Monthly rent, Long-term lease, Revenue share, Hybrid (rent + share), Build-to-suit, Open to proposals
Expected rent per month
₹40,000 /mo
Specifications
- Site type
- Land parcel
- Commercial model
- Monthly rent, Long-term lease, Revenue share, Hybrid (rent + share), Build-to-suit, Open to proposals
- Suitable for
- AC charging, DC fast charging, Battery swapping, Fleet / depot charging, Charging hub
- Plot / site area
- 1500 sq ft
- Plot dimensions
- 50 X30
- Road frontage
- 40 ft
- Land use / zoning
- Commercial
- 24×7 public access
- Yes
- Distance to highway / main road
- 0 km
- Nearby landmark
- Opp to Chettinad 3rd gate and near DMART
- Map location
- Open map
- Your authority to offer the site
- Owner
- Traffic / footfall notes
- Kelambakkam to Vandalur is a heavy traffic zone
Specifications are provided by the seller. Confirm critical details before you buy.
Site assessment
Grid not verifiedConditional potential
Conditional potential as a site (52/100), but not investment-ready until ~65 kVA of grid capacity is confirmed. Suggested start: 1 × 60 kW DC.
Data confidence: low · assessed 2026-11-17
Suggested setup
60 kW
1 × 60 kW DC
Grid capacity needed
~65 kVA
not yet confirmed
Energy / month
6,159 kWh
range 2,640–9,000 · 8.2 sessions/day
Chargers nearby
0 within 5 km
0 ≤1 km · 3 ≤20 km (open map data)
- Traffic and accessibility (20)20 / 20
Vandalur - Mambakkam - Kelambakkam Road (primary) 30 m away; 6 major road segment(s) within 1 km
- EV demand and local catchment (15)5.6 / 15
5 shops, restaurants, offices, hotels and services mapped within 1 km, 54 within 3 km, 8 malls/supermarkets/hotels within 5 km (open map data under-counts places here); EV adoption factor 0.8 · low confidence
- Charging competition (15)12 / 15
0 known charging location(s) within 1 km, 0 within 3 km, 0 within 5 km, 0 within 10 km, 3 within 20 km (open map data is incomplete here — check on the ground) · low confidence
- Electricity availability (20)3 / 20
electricity connection not stated; spare capacity unknown; no utility approval yet · low confidence
- Land suitability and expansion (10)7 / 10
4 charging bay(s) estimated from 1500 sq ft; land use Commercial · low confidence
- Financial viability (15)1.5 / 15
expected case does not pay back within 10 years · low confidence
- Landowner commitment (5)3 / 5
offered by: Owner; financing of electrical works not stated; models: Monthly rent, Long-term lease, Revenue share, Hybrid (rent + share), Build-to-suit, Open to proposals
Strengths
- Strong road access — Vandalur - Mambakkam - Kelambakkam Road (primary) 30 m away.
- No charging location on open maps within 3 km (verify — map data is incomplete here).
To validate
- Thin local catchment — few destinations nearby.
- Grid capacity not confirmed: ~65 kVA needed for the recommended setup.
- Financials are thin in the expected case — needs a cheaper setup or a better tariff.
- Location is approximate (taken from the landmark in the owner's message) — an exact GPS pin will sharpen the score.
How this is calculated
Grid readiness: ~65 kVA needed; electricity availability, spare capacity and utility approval not yet provided. Setup: best risk-weighted return for this location; electrical capacity still to be confirmed.
- Country assumptions: India; prices in INR.
- Selling price ₹20/kWh DC and ₹14/kWh AC; electricity bought at ₹9/kWh.
- DC demand at maturity for an average site: 3 / 7 / 12 sessions/day (conservative / expected / optimistic) × location factor 1.25 × competition factor 0.94 × 1 for 60 kW, capped at 12 sessions per DC point per day.
- 25 kWh per DC session, 12 kWh per AC session. Daily kWh = sessions/day × kWh/session; month = 30 days.
- Year 1 at 50 % and year 2 at 80 % of mature demand; 10-year horizon; NPV at 12 %.
- Site owner share: declared rent ₹40,000/month. Fees 5 % of revenue + ₹1,500/charger/month software; O&M 2.5 % of charger cost per year.
- Required kVA = charger kW × simultaneity (0.85 for 3+ points) ÷ power factor 0.95. Loads up to 100 kVA are assumed to fit a low-voltage connection; above that a dedicated transformer (min ₹6.0 L, ₹4,000/kVA). Grid works/deposit ₹1,500/kVA when spare capacity does not cover the load.
- Location data: OpenStreetMap contributors (roads, places, charging stations). Satellite and street-level imagery are not used yet; a site visit is still needed.
Automatic screening estimate by Talvix from the site owner's details and open map data. It is not an inspection, engineering design, valuation or investment advice, and it promises no income. Grid capacity, demand and costs must be confirmed on site and with the electricity utility.
Description
Public questions & comments (0)
Comments are public. Don't share phone numbers, emails or site details. A price in a comment isn't an offer — use “Make offer”.
Sign in to ask a question.
Land Lease Proposal for charging station/ battery swapping